Help us to determine the operating costs by providing your input into the design....

The City of Mount Gambier is developing a project proposal for the Mount Gambier Regional Sport and Recreation Centre (MGRSRC), an all-weather aquatic, sports and recreation facility.

As part of this process we are working with the community to identify ways the facility can fulfill our communities interests and aspirations, including the delivery of both cultural and sporting activity at the site. This information will be invaluable in ascertaining how such a facility can be used, the design elements required and the financial implications in its delivery.

Here is some of the input we have received so far:

Music and culture think tank
13 August
  • Engineered sound and lighting provisions
  • Access to three phase power
  • Fit for purpose stage
  • Green rooms
  • Loading access
  • Flexible lighting options
  • Performance standard accoustics
  • Robust and durable flooring

Community Reference Group
7 August 2018
  • large group access points
  • Flow between indoor and outdoor spaces
  • Interactive displays and galleries
  • Function space - size and use
  • Alternative onsite location of cafe
  • Parking
  • A central and visible creche
  • Disability access
  • Storage and office space
  • Flexibility to cater for multiple sports

Business Feedback
"The proposed facility could be just what we need moving forward as we require access to a large central space in town with good kitchen facilities to continue to jost major events such as our biennial trade show which attracts more then 500 visitors, suppliers and industry representative." Jo Morris, The Distributors Mt Gambier

Workshops with young children
9-13 August 2018
  • Aniaml themeed play equipment
  • Water mushrooms
  • Big splashpad
  • Inclusion of small slides
  • Things to climb
  • Ample space to play with family and friends
  • Inflatable and temporary installations
  • Colourful, bright and fun
Help us to determine the operating costs by providing your input into the design.

View the draft concept plan and provide your input via the "Have Your Say" forum, directly to a member of the Community Reference Group, email city@mountgambier.sa.gov.au(External link) or contact a member of our team listed in the "Who's Listening" section (bottom right).
Share Help us to determine the operating costs by providing your input into the design.... on Facebook Share Help us to determine the operating costs by providing your input into the design.... on Twitter Share Help us to determine the operating costs by providing your input into the design.... on Linkedin Email Help us to determine the operating costs by providing your input into the design.... link
<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>